Icon A5

About:

From building ASN-1, the first production vehicle in Tehachapi, CA to moving and establishing a production line in Vacaville, CA. I was part of the the initial production crew that grew from 3 to 30 in the matter of a year.

Composite bonding, tooling, trim and drill, hardware installs, process, flow, supply chain, etc all had to be developed to ramp production all while building a team and facility to do it with.

By